Quality products can only perform well if they are installed properly.
How to vinyl siding starter strip.
Cellwood 150 in.
It protects the sheathing from rain snow and pests.
Snap a level chalk line for the first starter strip at the base of the wall no less than 8 inches above ground level after determining the lowest corner of the house.
The bottom of the starter strip the part the bottom panel hooks on to should be at least 1 in.
This chalk line should be level and a consistent distance from the eaves or the top and bottom of the windows.
Helps keep the siding installation level.
Below the top of the foundation but the lower the vinyl siding is installed the better.
For the remaining vinyl siding panels to be installed correct and level beginning with the lowest row you must install the starter strip correctly.
This is where the new siding will begin.
The starter strip is the first strip of vinyl siding that is nailed to the wall.
Resists fungus mildew and wood boring insects.
Vinyl starter strip useful for locking the first course of siding in place.
Vinyl siding starter strips.
Vinyl siding is no exception.
Find vinyl siding starter strips at lowe s today.
It is a small strip of vinyl siding that has a locking channel on it that the first full sized vinyl siding panel.
This video shows how to install a starter strip for vinyl and polymer siding installation.
1 2 inch 1 3 cm plywood or osb are common substrates and these are generally covered with roofing felt or another moisture barrier prior to siding the walls.
Made of low maintenance vinyl.
Thd sku 438401.
Remember to make sure the sheathing is smooth before you apply the siding so the siding can be smooth also.